Green Meter Price in Pakistan 2025: Latest Update on Net-Metering Cost, Fees & Packages

In 2025, many people in Pakistan are searching for “Green Meter Price in Pakistan 2025” because solar energy and net-metering systems are becoming more popular. A green meter (also called a bi-directional or smart meter) helps consumers reduce electricity bills by sending extra solar energy to the national grid. This year, the government and DISCOs have updated the net-metering cost, fees, and export rates, which every solar user should know.

Green Meter & Net-Metering Details 

A green meter measures two-way electricity flow — it records how much electricity you use from the grid and how much solar energy you send back. Through net metering, you can adjust your monthly bill by exporting extra power. In 2025, solar energy use has grown very fast in Pakistan, and now many homes and offices are connected through this system.

Read More: CM Green Tractor Scheme Phase 3

Latest Green Meter Prices & Charges 2025

ItemPrice / Estimate (PKR)Notes / Conditions
Bi-directional / Green Meter (basic)~ Rs. 43,000Includes meter + installation package (varies by DISCO)
Installation / Commissioning Fee~ Rs. 3,000 extraWiring adjustments, sealing, connection setup
Buy-back / Export RateRs. 10 per unitCurrent rate for exporting solar power
Former Export RateRs. 27 per unitOlder rate, now reduced
Net Metering Rate (average)Rs. 19.32 per unitFor billing adjustment reference

Note: Prices vary depending on the electricity distribution company (LESCO, IESCO, MEPCO, etc.) and the type of connection (single-phase or three-phase).

Why the Green Meter Price in Pakistan

  1. Lower Export Rate: The export rate has dropped from Rs. 27 to Rs. 10 per unit. This change was made to reduce subsidy pressure on the national grid.
  2. Grid Strain: Pakistan’s grid is under pressure due to the large number of solar panels installed nationwide.
  3. High Manufacturing Costs: Global prices of sensors and smart electronics have increased, raising meter prices.
  4. DISCO Policy Differences: Each region’s electricity company has its own installation and service fees, which cause variations in price.

Read More: Ehsaas Kafalat Payment Collection Channels

Solar System Packages for Comparison

System CapacityAverage Cost (PKR)
5 kW550,000
10 kW850,000
12 kW978,000
15 kW1,150,000

How to Apply for a Green Meter 

  1. Install Solar Panels: Choose a system that matches your energy use.
  2. Prepare Documents: CNIC, property proof, and solar setup details.
  3. Submit to Local DISCO: They will check safety and eligibility.
  4. Inspection Visit: DISCO staff visit your site for verification.
  5. Meter Installation: The new green meter is installed and sealed.
  6. Activate Net Metering: Sign a contract with your DISCO.
  7. Quarterly Settlement: Your exported energy is credited in bills.

Read More: FBR Tax Return Filings

Benefits & Challenges

Benefits:

  • Lower electricity bills
  • Earn credits for surplus power
  • Clean and eco-friendly energy
  • Less grid dependency

Challenges:

  • Lower export rate (Rs. 10/unit)
  • High initial meter cost
  • Changing government policies
  • Regular maintenance required

Latest Trends in 2025

  • DISCOs have fixed green meter prices around Rs. 43,000 + Rs. 3,000 installation.
  • The buy-back rate has been officially reduced to Rs. 10/unit.
  • Pakistan’s solar capacity continues to rise, leading to updates in energy policy.

Final Thoughts

The Green Meter Price in Pakistan 2025 reflects a new energy shift in the country. Despite higher setup costs and lower export rates, installing a green meter is still a smart step for families aiming to save money and promote clean energy. By using solar systems and net metering, Pakistanis can move toward energy independence while protecting the environment.

Related Posts

Leave a Comment